Get your WPC registration filed right with S.K. & Associates. We handle ETA certification, import licensing, and RF test coordination for every wireless-enabled device entering the Indian market.
Expert Professionals
Genuine Reviews
Assisted Clients
Trusted Clients
WPC registration is the approval every wireless-enabled device needs before it can be imported, manufactured, or sold in India, and most people only encounter the term Equipment Type Approval, or ETA, once they're already holding a container of Bluetooth speakers at a port with nowhere to go. Skip it, and the device isn't just non-compliant. It's illegal to sell, full stop.
A lot of what circulates about WPC fees and licensing is outdated or, in a few cases, describing an entirely different DoT license category by mistake. Talk to S.K. & Associates, and we'll file your WPC registration against what the Department of Telecommunications actually requires today.
WPC registration, most commonly encountered as Equipment Type Approval, is the certification issued by the Wireless Planning and Coordination Wing of the Department of Telecommunications confirming that a wireless-enabled device is safe to operate on Indian frequency bands. The WPC Wing itself has run India's radio spectrum since 1952, and its authority traces back to the Indian Wireless Telegraphy Act, 1933, read alongside the Indian Telegraph Act, 1885.
Here's the distinction worth getting right early: WPC is not BIS. The Bureau of Indian Standards certifies product safety and quality against IS codes. WPC certifies that a device's radio transmission won't interfere with telecom, aviation, or defence spectrum. A product can need both, and confusing the two consultants or the two certificates is a common, costly mistake.
Every application runs through the Saral Sanchar portal, DoT's single-window system for WPC licensing. Once granted, the ETA confirms your device is cleared to transmit on its declared frequency band, and it becomes the document customs and market inspectors ask for first.
A few things shifted the practical filing experience over the last few years, and 2026 added more on top.
Since 2021, RF test reports for WPC filings have to come from an Indian laboratory accredited by NABL or TEC. Reports from ISO or ILAC-accredited foreign labs, which used to be routinely accepted, no longer clear the portal.
DoT rolled out mandatory 2FA on the portal, tightening account security for every applicant filing WPC, licensing, or authorisation requests through the system.
Approved licenses and authorisations, including Unified Licenses and related network approvals, can now be pulled directly through the Entity Locker instead of chasing a separate download from the portal each time.
These sit alongside WPC's core equipment approval process and matter mainly to businesses combining network authorisations with their device import or licensing footprint.
None of this changes who needs an ETA. It changes which lab you can use and how you access what you're approved for once you have it.
If a device transmits or receives radio signals, in nearly every category of consumer and commercial electronics sold today, it needs this before it reaches an Indian shelf.
Bringing finished wireless devices into India for resale.
Producing wireless-enabled products domestically.
Trading in wireless equipment.
Selling into India through an Indian representative.
Electronics import and distribution hubs like Lamington Road in Mumbai and Nehru Place in Delhi run heavily on ETA-cleared inventory, since customs holds any consignment where the declared devices don't have a matching ETA on file. An active Import Export Code (IEC) and GST registration are the baseline paperwork every applicant needs before a Saral Sanchar application can even be created.
Most of what you need proves who you are, what the product does, and that it's been tested properly.
Navigating India's wireless equipment compliance requires a systematic progression through frequency identification, localized RF laboratory evaluation, regulatory portal filing, and systematic fee payment to secure a valid electronic type approval certificate.
Check whether your product operates in a delinked band like 2.4 GHz or 5 GHz. This single check decides whether you qualify for the faster self-declaration route or the longer standard review.
Send the product to a NABL- or TEC-accredited Indian laboratory for testing. Since 2021, this has to be an Indian lab. A foreign lab report, however accredited internationally, won't clear the portal anymore.
Create an account on the Saral Sanchar portal, DoT's official system for WPC applications. If you don't already have an Import ID, the system generates one during this step.
Enter product details, select the correct category, and upload your business documents, RF test report, and technical specifications. Foreign manufacturers attach their Authorized Indian Representative authorisation here too.
Pay ₹10,000 per model through the portal's payment gateway. This is a flat per-product charge, not a percentage of anything, and it applies whether the filing covers a finished device or a standalone RF module.
WPC reviews the application and test documentation. Self-declaration filings with clean documentation often clear within days. Standard review filings, or anything involving a non-delicensed band, take longer.
Once approved, download the certificate directly from Saral Sanchar. Keep the model number on it consistent with every downstream document, invoice, and Bill of Entry, since a mismatch here is one of the most common reasons customs flags a shipment later.
The headline number is smaller than most people expect, and the variable cost is the RF testing, not the government fee.
| Cost Component | Amount |
|---|---|
| ETA Government Fee | ₹10,000 per model |
| RF Lab Testing | Roughly ₹15,000 to ₹30,000, depending on product complexity |
| Professional or Consultation Fees | Varies by service scope |
Import License, DPL, and NDPL fees are assessed on a case-by-case basis depending on the scale and category of operation, and they sit outside the standard ETA fee entirely. Be cautious of any figure quoted for these without a source, since a fair amount of content online currently conflates them with a completely different, much larger telecom service license category.
Timeline depends heavily on which route your product qualifies for. A delicensed-band device going through self-declaration, with a clean RF report and no document mismatches, can clear in as little as a few working days to about two weeks. A standard review filing, or a more technically complex device like a 5G component or custom radio equipment, typically runs 4 to 6 weeks, and can stretch further if the RF report needs rework.
Selling an uncertified wireless device isn't a paperwork gap. It's an active violation with real enforcement behind it.
Customs detention of the consignment at port.
Financial penalties and potential seizure of stock.
Interference violations, treated as a serious offence, not just a licensing gap.
Application and ongoing compliance both invalid.
The cost comparison here isn't close. A ₹10,000 ETA fee against a detained shipment racking up port storage charges, or a seized batch of inventory, is not a real trade-off for any business planning to operate long term.
An ETA carries lifetime validity once granted, and there's no periodic renewal requirement as long as nothing about the product changes. That said, "nothing changes" is doing more work in that sentence than it looks like. A revised model number, a different chipset, or a frequency band change all require a fresh filing, not an update to the old one.
WPC can also revoke a certificate if a product turns out not to match what was declared, so keeping your technical documentation consistent with what's actually shipping matters well after approval, not just at the application stage.
The one nearly every importer and manufacturer needs. It applies to devices operating in unlicensed frequency bands — the 2.4 GHz and 5 GHz ranges that cover the overwhelming majority of Bluetooth and Wi-Fi products. Most ETA filings for these bands qualify for the self-declaration route, which moves considerably faster than the standard review track.
Covers bringing wireless products into India for sale. Part of what WPC calls Non-Network licensing.
Applies to dealers and distributors trading in wireless equipment.
Covers an entity that holds wireless equipment without dealing in it — a cable operator using wireless links internally, for example, rather than selling wireless products to others.
Covers R&D, trials, and testing of new wireless technology that doesn't yet have standard ETA clearance, typically used by labs and manufacturers developing new radio equipment before commercial launch.
Covering things like internet service provision over licensed spectrum. Sit in a separate DoT licensing track tied to telecom service delivery rather than device approval.
If your business model involves providing network services rather than importing or selling devices, that's a different application altogether, and conflating the two fee structures is one of the more expensive mistakes an applicant can make.
Many electronics brands encounter significant clearance holdups by relying on outdated overseas laboratory certifications, misjudging model variation guidelines, skipping local representation mandates, or completely confusing distinct wireless mandates with separate product safety frameworks.
Why does a seemingly simple online application result in so many rejected filings and detained shipments? The difficulty isn't in the Saral Sanchar portal's user interface — it's in the strict technical prerequisites required before you even click submit.
If your technical datasheet lists a frequency range or output power that differs even slightly from your NABL-accredited RF test report, WPC will flag the discrepancy and halt the application.
A minor colour variation or a memory upgrade is treated as a completely distinct model if the internal RF module changes, meaning a single ETA doesn't blanket-cover your entire product line.
They must legally appoint an Authorized Indian Representative (AIR) to assume compliance liability.
Resubmitting after a rejection means your inventory sits in a port racking up demurrage fees while you start over.
S.K. & Associates streamlines your wireless market entry by offering preliminary spectrum mapping, managing accredited domestic laboratory relationships, structuring mandatory local representation, and coordinating documentation to ensure immediate compliance and hassle-free customs clearance.
We confirm whether your product qualifies for self-declaration before you commit to a testing and filing timeline.
We work only with Indian labs that meet the current 2021-onward testing requirement, so your RF report doesn't get rejected on a technicality.
For foreign manufacturers without an Indian office, we handle the appointment and ongoing compliance role.
We route your application to ETA, Import License, DPL, or NDPL based on what your business actually does, not a generic template.
We keep model numbers and technical specifications consistent across your ETA, invoices, and Bill of Entry, so nothing flags at the port.
Handling ETA registration internally might seem like a way to save on consultation fees, but the hidden costs of a delayed launch or a blocked shipment quickly outpace the initial savings.
| Compliance Step | DIY Application | S.K. & Associates Expert Filing |
|---|---|---|
| Lab Coordination | You must find, vet, and negotiate with a NABL/TEC accredited lab yourself. | We manage direct testing with pre-vetted, highly reliable Indian labs. |
| Technical Review | High risk of RF report parameters mismatching your portal declarations. | Zero-error technical specification review before submission. |
| Foreign Representation | Foreign brands must navigate finding and legally appointing a liable Indian representative. | We provide compliant Authorized Indian Representative (AIR) services. |
| Rejection Handling | You handle Department of Telecommunications (DoT) technical queries alone. | We answer technical queries directly and rapidly to keep applications moving. |
| Customs Readiness | High risk of document mismatches causing port detentions. | We ensure all model numbers perfectly match your eventual Bill of Entry. |
Connect with S.K. & Associates today and let our experts handle your WPC Registration while you focus on growing your business.
WPC registration is one of those approvals that looks like a formality right up until a shipment sits detained at a port with a director asking why nobody filed for it sooner. The government fee itself is modest. The cost of getting the category, the lab, or the documentation wrong is not.
If you're bringing a new wireless product into the Indian market, or you're not confident your existing ETA actually matches what's currently shipping, that's worth checking before your next consignment arrives, not after.
Connect with S.K. & Associates and get your WPC Registration in India filed correctly against the current Saral Sanchar process.